ARMOR h.d.d cooler
Published 2011-11-30
For dual 5.25” Drive Bays into a three 3.5”&2.5”H.D.D.
STEP 1
Please put hard discs into the main body of heatsink.
STEP 2
Please screw the screws on two sides of main body.
STEP 3
Please dismantle the right and left side boards of case.
STEP 4
Then please take off two 5.25” plastic faceplates.
STEP 5
Please put the main body of heatsink into the case.
STEP 6
After putting into the case, please screw two sides.
STEP 7
Please plug in the power cords.
STEP 8
Finished installation.
COPYRIGHT EVERCOOL THERMAL CO.,LTD. 2012. ALL RIGHTS RESERVED